ADVERTISEMENT FOR BIDS

CITY OF ATTALLA

ATTALLA, ALABAMA

2022 CWSRF MAJOR SANITARY SEWER IMPROVEMENTS

Sealed bids for the 2022 CWSRF Major Sanitary Sewer Improvements Project will be received at Attalla City Hall located at 612 4th St. NW, Attalla, AL 35954 until Thursday, August 8, 2024 at 1:00 P.M. local time at which time the Bids received will be publicly opened and read.

The Project includes the following Work: CCTV inspection of approximately 11,675 LF of 30” sanitary sewer gravity main including repairs, and approximately 4,000 LF of 30” sanitary gravity sewer mains with 225 VF of manhole rehabilitation and related appurtenances. Information for the Project can be found at the following designated website: www.gmcnetwork.com

The Issuing Office for the Bidding Documents is Goodwyn Mills Cawood, LLC, 2400 5th Avenue South, Suite 200, Birmingham, AL 35233, Attn: Lauren Gallo (lauren.gallo@gmcnetwork.com). Prospective Bidders may examine the Bidding Documents at the Issuing Office on Monday through Friday between the hours of 8:00 a.m. – 5:00 p.m., and may obtain copies of the Bidding Documents from the Issuing Office as described below.

Copies of the Bidding Documents may be obtained from the Issuing Office, during the hours indicated above, upon payment of a deposit of $20.00 for a one-time administrative fee for digital access/file sharing and/or $100.00 for each set. Said cost represents the cost of printing, reproduction, handling, and distribution, therefore no refund will be granted. Checks for Bidding Documents shall be payable to “GMC.” Partial sets of Bidding Documents will not be available from the Issuing Office. Neither Owner nor Engineer will be responsible for full or partial sets of Bidding Documents, including Addenda if any, obtained from sources other than the Issuing Office.

Bid security shall be furnished in accordance with the Instructions to Bidders.

This project is being funded by SRF Project No. CS010504-04 and will require DBE documentation from the low, responsive, responsible bidder no later than 10 days after bid opening. This project is being supported, in whole or in part, by federal award number SLFRP2635 awarded to the State of Alabama by the U.S. Department of the Treasury.

All participants must comply with all federal requirements applicable to the Loan (including those imposed by the 2014 Appropriations Act and related SRF Policy Guidelines) which the Participant understands includes, among other, requirements that all of the iron and steel products used in the Project are to be produced in the United States (“American Iron and Steel Requirement”).

The Owner reserves the right to waive any informalities, or to reject any or all bids, and to award the contract to the best and most responsible bidder. All bidders shall submit, upon request, a list of projects “successfully completed” in the last 2 years, having the same scope of work and approximate construction cost as specified in this project. All bidders must comply with requirements of the Contractor’s Licensing Law of the State of Alabama and be certified for the type of work on which the proposal is submitted. Each bidder must deposit with his bid, security in the amount, form and subject to the conditions provided in the Instructions to Bidders.

All Bidders bidding in amounts exceeding that established by the State Licensing Board for General Contractors must be licensed under the provisions of Title 34, Chapter 8, Code of Alabama, 1975, and must show evidence of license before bidding or bid will not be received or considered by the Engineer; the Bidder shall show such evidence by clearly displaying the license number on the outside of the envelope in which the Proposal is delivered.

No bidder may withdraw his bid within 60 days after the opening thereof.

Owner: City of Attalla

By: Larry Means

Title: Mayor