Carrollton DRA Sewer System Upgrades
Bid Notification
Grantee Name: Carrollton DRA Sewer System Upgrades Project – Contract #2
Project Location: Carrollton, AL
Contact Person: Madison (Madi) Brake, EIT
Phone number: 205-752-4037
Email: mbrake@insiteengineering.org
Address: 515 Energy Center Blvd, Northport, AL 35473
FSG: 46
NAICS: (if known) 237110
Bid Closing Date: May 22, 2025, 11:00 AM (CST)
Project Description: Contract #2 of Carrollton DRA Sewer System Upgrades Project to include sewer line and storm sewer pipe video inspection, cleaning, de-rooting, and cured-in-place pipe lining (CIPP). Project to also include manhole structure cleaning, cured-in-place-manhole lining (CIPMH), and manhole riser sections.
Type/Quantity of
Materials/Services
Needed: (if Applicable) Approx. 1500 LF of video inspection, cleaning, and de-rooting of 8” and 10” sewer pipes and 15” storm sewer pipes. Approx. 1000 LF of CIPP lining for 8”, 10”, and 15” pipes. Approx. 40 VF of manhole structure cleaning, approx. 20 VF of CIPMH lining, and approx. 3 VF of manhole riser sections.