Carollton Lift Station Upgrades
For full bid package email lindsay.frey@ua.edu
Grantee Name: Carrollton ARC Lift Stations Upgrades Project (ARC AL-21663-302-24)
Project Location: Carrollton, AL
Contact Person: Madison (Madi) Brake, EIT
Phone number: 205-752-4037
Email: mbrake@insiteengineering.org
Address: 515 Energy Center Blvd, Northport, AL 35473
FSG: 46
NAICS: (if known) 237110
Bid Closing Date: May 13, 2025, 11:00 AM (CST)
Project Description: Replace duplex submersible sewage pumps in each of the Town’s
four existing lift stations, replace aerator in Town’s wastewater
lagoon constructed wetland for tertiary treatment, and replace
electrical control panels for lift stations #3 and #4 new pump
installations.
Type/Quantity of
Materials/Services
Needed: (if Applicable)
Sulzer Submersible Sewage Pump Model XFP100ECB1.4 PE90/4
(12.07hp, 230v, 3ph; PE2 Frame, 49′ of Cable, Including Delivery,
Installation, and Electrical Connection to Existing Control Panels)
Vaughn Submersible Raw Sewage Chopper Pump Model SE3P-082
(7.5hp, 230v, Including Cable, Guide Claw, and Portable Lifting Hoist,
Electrical Control Panel, Electrical Connections, Delivery, and
Installation)
Kasco Surface Aerator Model 4400AF with Bottom Screen, 1 HP,
120V, 100′ Cord (Including Installation and Electrical Service
Connection)