Aliceville Broad Street Waterline Replacement
Grantee Name: Aliceville Broad Street Waterline Replacement Project; CONTRACT A ARC AL-22588-2025
Project Location: Aliceville, Alabama
Contact Person: Madison (Madi) Brake, EIT
Phone number: 205-752-4037
Email: [email protected]
Address: 515 Energy Center Blvd, Northport, AL 35473
FSG: 46
NAICS: (if known) 237110
Solicitation Number:
(if known) N/A
Bid Closing Date: May 12, 2026, 9:00 AM (CST)
Project Description: Installation of approximately 580 linear feet of 6-inch ductile iron water main along Broad Street, including connections to the existing water distribution system, installation of valves and fittings, and abandonment of portions of the existing water main as shown on the plans.
Type/Quantity of
Materials/Services
Needed: (if Applicable) 6″ Ductile Iron Waterline and Installation (Including Excavation and Crusherrun Stone Backfill) 6″ Tapping Valve and Sleeve (Including Fittings, 3/4″ D.I. All-Thread Spool, Precast Concrete Valve Pad, Excavation, Crusherrun Stone Backfill, and Tie to Existing System) 6″ Inline Gate Valve (Including Fittings, Valve Box, Precast Concrete Valve Pad, Excavation, & Crusherrun Stone Backfill) 2″ Ductile Iron Waterline and Installation (Including Excavation and Crusherrun Stone Backfill) 2″ Inline Gate Valve (Including Fittings, Valve Box, Precast Concrete Valve Pad, Excavation, & Crusherrun Stone Backfill) Misc. 2″ and 6″ Ductile Iron Fittings
125 LF Horizontal Directional Drilling and Installation of 6″ SDR11 HDPE Watermain (Existing Box Culvert Crossing) Cut, Plug, Cap (Megalug) Existing Waterline Tie-Ins to Existing Distribution System Concrete Restoration (Parking Areas Only) Saw Cutting / Demolition of Existing Concrete Drive (Within New Waterline Installation Trench Limits Only) Temporary Utilities