Skip to content

Aliceville Broad Street Waterline Replacement

Grantee Name: Aliceville Broad Street Waterline Replacement Project; CONTRACT A ARC AL-22588-2025

Project Location: Aliceville, Alabama

Contact Person: Madison (Madi) Brake, EIT

Phone number: 205-752-4037

Email: [email protected]

Address: 515 Energy Center Blvd, Northport, AL 35473

FSG: 46

NAICS: (if known) 237110

Solicitation Number:

(if known) N/A

Bid Closing Date: May 12, 2026, 9:00 AM (CST)

Project Description: Installation of approximately 580 linear feet of 6-inch ductile iron water main along Broad Street, including connections to the existing water distribution system, installation of valves and fittings, and abandonment of portions of the existing water main as shown on the plans.

Type/Quantity of

Materials/Services

Needed: (if Applicable) 6″ Ductile Iron Waterline and Installation (Including Excavation and Crusherrun Stone Backfill) 6″ Tapping Valve and Sleeve (Including Fittings, 3/4″ D.I. All-Thread Spool, Precast Concrete Valve Pad, Excavation, Crusherrun Stone Backfill, and Tie to Existing System) 6″ Inline Gate Valve (Including Fittings, Valve Box, Precast Concrete Valve Pad, Excavation, & Crusherrun Stone Backfill) 2″ Ductile Iron Waterline and Installation (Including Excavation and Crusherrun Stone Backfill) 2″ Inline Gate Valve (Including Fittings, Valve Box, Precast Concrete Valve Pad, Excavation, & Crusherrun Stone Backfill) Misc. 2″ and 6″ Ductile Iron Fittings

125 LF Horizontal Directional Drilling and Installation of 6″ SDR11 HDPE Watermain (Existing Box Culvert Crossing) Cut, Plug, Cap (Megalug) Existing Waterline Tie-Ins to Existing Distribution System Concrete Restoration (Parking Areas Only) Saw Cutting / Demolition of Existing Concrete Drive (Within New Waterline Installation Trench Limits Only) Temporary Utilities

Back To Top